Common Description
Equipped with the zero leak bidirectional checking sole-noid valves, this energy unit is designed for the operation of two independent circuits. Which are respectively for your major and subordinate platforms of your double scissors lift. Two cut-off valves are utilized for decreasing the machine manually in situation of power reduction. If far more independent circuits are needed to your application please contact us for availability.
Remark: one. Please talk to our revenue engineer for that various pump displacement, motor power or tank capacity.
2. CSA or UL licensed motors are available on request.
Specific Notes
1. The AC motor is of S3 duty cycle, which might only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean every one of the hydraulic elements concerned ahead of installation of the power unit.
three. Viscosity on the oil shoud be 15~46 cst,and also the oil need to be clean and absolutely free of impurities,N46 hydraulic oil is proposed.
four. The power unit must be mounted vertically.
five. Check the oil level while in the tank after the initial running of your power unit.
6. Oil modifying is required soon after the preliminary a hundred operation hours,afterwards once every single 3000 hours.