STAINLESS EPT SCREWED EPT FITTINGS
1.EPT: SS201, SS304/CF8, SS316/CF8M
Thread Ending: NPT, DIN, BSP, BSPP, BSPT, ISO7-1, ISO228-1 and so forth.
Measurement: one/four quot-four quot
Force: 150LB
We can also create some OEM components in accordance to customer's ask for.
Application: Used to stainless steel pipeline program, h2o method, petrolum technique and so forth.
Solution identify | Stainless Steel Thread EPT JCEPs |
one)EPT | A105, 304, 304L, 316, and so on |
two)Size | one/4''-4'' ampDN6-DN100 |
three)Certification | ISO9001: 2000,CE |
four)Operating pressure | |
5)EPTion Finishes | Socket weld or Threaded: NPT, BSP, BSPT and many others. |
6)Suited medium | EPT, chemical, EPTT, gasoline, water, linepipe, heat exchanger, shipbuilding, design, high amplow force pipeline etc. |
seven)Temperature Range | -20-three hundred degree C |
8)Variety: |
Elbow, Tee, avenue elbow, cross, coupling, hex nipple, barrel nipple, plug, bushing, cap, union, hose nipple, welding nipple, hex.nut, etc. |
Our gain | We have been labored in this area for more than 15 a long time, and we know every single market's request, with a excellent replutation among our consumers, we alwaEPTTpersuit a large quality and greatest provider and price . |
sample check ahead of machining, and one hundred% test after the machining | |
We also have a collection of merchandise this kind of as: flanges, pipes, cast fittings, ball vavles and butterfly valves And some EPT parts these kinds of: Submit Anchors, Floor JCEPs, and some other wooden connectors. | |
7day / 24 hrs on the web support, and Fastest delivery time. | |
we can do OEM merchandise | |
Cargo | |
Supply time | usually twenty five daEPTTaround and can negotiate as per orEPTTqty |
EPT port | TIANEPTT XiHu (West EPT) Dis.HU (WEST LAKE) DIS.G |
Term of Payment | T/T, L/C, DP and many others. |
Package depth | polybag cartons pallet / wood case |
MOQ | 20 PCS/size |
Gurantee Interval | 18 monthes |